The tunnel operator, Eurotunnel, said the 50-kilometre undersea link was back to “full capacity” after a power fault inside it was fixed overnight on Tuesday.
Read more at Read More
The tunnel operator, Eurotunnel, said the 50-kilometre undersea link was back to “full capacity” after a power fault inside it was fixed overnight on Tuesday.
Read more at Read More